Modular prefabrication: Factory production as a whole, on-site hoisting and splicing, can be completed in 1-3 days, not affected by seasonal weather.
Views:1 Post Date:2026-04-24Fixed booth: brick wood hybrid structure is preferred, and solid wood columns and beams need to undergo triple treatment of anti-corrosion, insect proof, and fire proof; The wall can be made of green brick patches or antique cultural stones, and the roof can be made of resin antique tiles (lightweight, non fragile, and easier to maintain than traditional ceramic tiles).
Views:2 Post Date:2026-04-24Stay away from the core activity area, residential building windows, and dining areas (with a straight-line distance of ≥ 10 meters) to avoid odors and mosquitoes that may affect the living/sightseeing experience.
Views:1 Post Date:2026-04-24Jiangnan Water Town/Garden Scenic Area: Priority should be given to white walls and black tiles, sloping roofs, moon cave doors, and wooden grid designs, paired with bluestone floors and carved partitions, with reference to the details of Soviet style garden architecture.
Views:1 Post Date:2026-04-24